Who Built This
Will Price | Chief Solutions Architect
Background: 15+ years perfecting 5D solutions and business models through systems architecture, intelligence analysis, and AI-driven complex adaptive systems. Specialized in identifying leverage points that others miss.
The AI Story: Decades of experience in tech strategy culminated in using AI tools to map interconnections across healthcare, economics, jobs, politics, and peace. The result: PHIERS — a solution that solves five crises simultaneously because they're all connected.
Why PHIERS: Not a politician. Not a lobbyist. Just someone who saw the mathematical opportunity everyone else missed—and built the blueprint to execute it. December 11, 2024 wasn't the origin — it was the validation of 15+ years of work.
Contact: (916) 306-8967 | info@phiers.org
The Breakthrough: December 11, 2024
The moment: Congress rejected both healthcare plans. 22 million Americans about to lose coverage. Everyone said, "There's nothing we can do."
But there was a pattern no one was seeing.
CMS pays $8,000/year per person for traditional insurance. 80% don't need hospitalization—they'd be fine with $600/year telehealth. That's $7,400 freed per person. Enough to pay for 12 others.
One conversion funds 12. Those 12 fund 148. 148 fund 1,825. Exponential. Unstoppable.
Why This Works When Other Solutions Fail
1. Self-Funding Mechanism
Every conversion generates $7,400+ in freed government savings. That money pays for the next 12 conversions. The system funds itself through exponential compounding. Congress can't "defund" something that literally generates money through efficiency.
2. Mathematical Inevitability
3.5% of Americans organized = guaranteed systemic change (Harvard research, Erica Chenoweth). We're targeting 100M+ = 9x the threshold. This isn't hope—it's mechanics.
3. Cooperative Structure (No Profit Extraction)
Members control their own healthcare choices. No corporate middlemen. No profit extraction. 100M+ organized = largest pharmaceutical buyer in the nation = market dominance through pure purchasing power.
4. Solves 5 Crises Simultaneously
Healthcare + Jobs + Economy + Politics + Peace. Each dimension strengthens the others. Block one, the system adapts. This is systems thinking applied to national transformation.
Four Independent Validations
Pathos Communications (Fortune 500 PR Firm)
Top-tier PR firm verified PHIERS and confirmed interest from major outlets: International Business Times, Forbes, and USA Today.
Pathos stands behind Will Price personally and professionally. Publication pending funding goal. When a Fortune 500 PR firm publicly stakes their reputation on your movement, you know it's credible.
Watch: Why Pathos Chose PHIERS (7:11)
"This is not a pitch video. It's a statement of confidence." — Pathos Communications
Mark Cuban's Cost Plus Drugs
7 million customers. 80-90% prescription savings. 200+ retail pharmacies operational. Proves cooperative pharmaceutical buying works at scale.
ZORTT Elite Medical
Cooperative healthcare delivery model. Operational 2+ years. Proves member-controlled healthcare works.
Erica Chenoweth (Harvard Kennedy School)
Studied 323 political campaigns from 1900-2006. Finding: NO campaign where 3.5% of the population participated in sustained, organized action ever failed.
Translation: Systemic change isn't just possible—it's guaranteed once we reach and sustain 3.5% organized participation.
What Makes PHIERS Different
Most healthcare plans require Congress to spend more money.
PHIERS saves Congress $2.73 TRILLION annually by replacing expensive insurance with efficient telehealth.
We're not asking them to do something hard. We're showing them the math that makes it easy.
Congress will choose the path of least resistance. We're making PHIERS that path.
The Timeline
Click to enlarge • From Petition to Universal Coverage: The 90-Day Sprint
The Timeline to Universal Coverage:
- NOW: Build petition pressure (targeting 3.5% = 11.6M signatures)
- March 28, 2026: THE BIG DAY — We control the narrative and give teeth to the demands of the people
- Spring 2026: 3.5% threshold reached → Cascade begins
- July 4, 2026: 100M+ members = Independence Day from corporate control
- 8-13 months: Universal coverage for 234M of the 99%
Join the Movement
This is how 234 million Americans get coverage. This is how we force Congress to act. This is how we reclaim our government.